Land Survey Course

Best Total Station Training Institute in India

Best Total Station Training Institute in India is the detailed Inspection of  Total Station Training Institute in India is a scientific process by which we will measure the land (Horizontal Distance, Elevation, Direction, and Angle) and collect the data by measuring, by observation, field measurement after collecting the data we will easily determine the property boundary, it will also support the planning and designing.

Seevill Quantity Survey Institute Provide Complete Depth Knowledge of Land Survey. How to detect the actual boundary line how to mark that boundary line how to find the complete legal area of land. It is a complete land management Onsite training. We provide Complete Knowledge of LAND SURVEY with the help of Live equipment’s and live project. Seevill Quantity Survey Training Institute is the best institute For LAND SURVEYING in Delhi because we provide the actual and legal method to our students.

seevill quantity surveying institute
civil quantity survey course and land survey course in delhi and pune

Major Survey Use in Field

There are three types of survey majorly used in Field

  1. Geodetic Survey
  2. Topographic Survey
  3. Cadastral Survey

Geodetic Survey

Geodetic Survey entails the size of a very massive place of the earth that should take into account the earth’s curvature. After they take into account the authentic curvature of the earth, these are very accurate survey. Geodetic Survey are used as vital references and surveyor will use that reference when surveyor will surveying smaller areas of land

Topographic Survey

Topographic Survey   is consisting measurements of the vertical elevation of the floor being surveyed as properly as the synthetic constructions on it. Topographic Survey are extensively used by means of Governments and corporations enticing in construction.  Topographic Survey of land simply annexed with the aid of a town which plans to construct roads and different infrastructure for monetary development.

Cadastral Survey

Cadastral Survey are carried out to decide the boundaries between parcels of actual estate, regardless of whether or not the land is privately or publicly owned. A Cadastral Survey determines the boundary that will be identified for all prison purposes. By the help of Cadastral Survey we will easily identify the property taxes or the region of floor that will be transferred when we sell the property.

AUTO LEVEL

  1. SETTING UP THE TRIPOD
  2. CENTERING WITH OPTICAL PLUMMET
  3. LEVELLING
  4. FOCUSING THE TELESCOPE
  5. SETTING THE MEASUREMENT MODE AND PREPARING THE TARGET
  6. SETTING THE HORIZONTAL ANGLE
  7. SETTING TARGET HEIGHT AND INSTRUMENT HEIGHT
  8. SETTING THE STATION ELEVATION, CREATING A NEW JOB
  9. CHECKING AND ADJUSTING THE PLATE LEVEL, CIRCULAR LEVEL, OPTICAL PLUMMET
  10. TRIPOD SETTING, BUBBLE SETTING AND TILT SETTING
  11. CREATING NEW JOB/FILE, STATION, BACK SIGHT, FORE SIGHT AND POLE HANDLING
  12. MEASURING AND STORING POINTS, TAPE MEASUREMENT AND AREA SURVEY
  13. CHANGE POINT (CP) SHIFTING USING FORE SIGHT METHOD
  14. CHANGE POINT (CP) SHIFTING USING RESECTION METHOD, REM AND MLM
  15. SETTING OUT-USING COORDINATES
  16. SETTING OUT-USING DISTANCE AND ANGLE
  17. SETTING OUT-POINTS AT EQUAL LENGTH AND COLUMN MARKING
  18. LEVEL SHIFTING
  19. ANGLES AND AREA CALCULATION

TOTAL STATION

  1. SETTING UP THE TRIPOD
  2. CENTERING WITH OPTICAL PLUMMET
  3. LEVELLING
  4. FOCUSING THE TELESCOPE
  5. SETTING THE MEASUREMENT MODE AND PREPARING THE TARGET
  6. SETTING THE HORIZONTAL ANGLE
  7. SETTING TARGET HEIGHT AND INSTRUMENT HEIGHT
  8. SETTING THE STATION ELEVATION, CREATING A NEW JOB
  9. CHECKING AND ADJUSTING THE PLATE LEVEL, CIRCULAR LEVEL, OPTICAL PLUMMET
  10. TRIPOD SETTING, BUBBLE SETTING AND TILT SETTING
  11. CREATING NEW JOB/FILE, STATION, BACK SIGHT, FORE SIGHT AND POLE HANDLING
  12. MEASURING AND STORING POINTS, TAPE MEASUREMENT AND AREA SURVEY
  13. CHANGE POINT (CP) SHIFTING USING FORE SIGHT METHOD

ARCGIS

  1. INTRODUCTION TO ARCGIS
  2. DATA MANAGEMENT (RASTER DATA, VECTOR DATA, GEODATABASE, SHAPEFILES AND ATTRIBUTE QUERY)
  3. MAPPING AND VISUALIZATION (STYLING, MANAGING AND DISPLAYING LAYER)
  4. RASTER DATA ANALYSIS (SLOPE, HILLSHADE AND DEM)
  5. VECTOR DATA ANALYSIS (INTERSECT, BUFFER, UNION AND CLIP)
  6. GEO-STATISTICAL ANALYSIS TECHNIQUE (SPATIAL ANALYSIS AND NETWORK ANALYSIS

DGPS

  1. INTRODUCTION
  2. SETTING UP THE RECEIVER
  3. DATA TRANSFERRING
  4. GENERAL OPEARATION
  5. CABLE AND CONNECTORS
  6. BASE, ROVER, GPS CONNECTION AND SETTINGS
  7. GPS OPERATING AREA SURVEY
  8. DGPS SURVEY
  9. SETTING OUT
  10. DATA DOWNLOADING, DATA PROCESSING, CONVERTING DATA FORMAT INTO AUTOCAD FORMAT